DMS2030

Individual Assignment 1

Due Date: 11:59 pm, October 14th, 2024

1. A fertilizer company from San Diego has provided the following data.

 

Last Year ($)

This Year ($)

Sales

23,000

34,000

Labor

10,000

16,000

Raw Material

8,000

10,000

Capital Equipment

2,000

4,000

(a) Compute the labor, raw material, and total productivity for each year. (5 points)

(b) Compute the overall labor, raw material, and total productivity for the two years. (5 points)

2. The inventory of a supermarket turns 46 times a year. The manager of the supermarket says that everything that the store receives from vendors is, on average, sold in two weeks. Are these statements consistent? Assume there are 52 weeks in a year. (5 points)

3. A truck rental company serves 30 rental requests per week on average.  Each truck on average is rented for 3 weeks. The rental fee is $1,000 per truck per week. How many trucks are on renton average?  What is the average weekly revenue? (5 points)

4. A hospital emergency room (ER) is currently organized so that all patients register through an initial check-in process. At his or her turn, each patient is seen by a doctor and then exits the process, either with a prescription or with admission to the hospital. Currently, 55 people per hour arrive at the ER, 10% of who are admitted to the  hospital. On average, 7  people are waiting to  be  registered and  34  are registered and waiting to see a doctor. 代 写DMS2030  Compute the laborThe registration process takes, on average, 2 minutes per patient. Among patients who receive prescriptions, average time spent with a doctor is 5 minutes. Among those admitted to the hospital, average time is 30 minutes. On average, how long does a patient spend in the ER? On average, how many patients are being examined by doctors? On average, how many patients are there in the ER? Assume the process to be stable; that is, average inflow rate equals average outflow rate.

Please refer to the diagram next page.

 

(a) On average, how long does a patient spend in the ER? (5 points)

(b) On average, how many patients are being examined by doctors? (5 points)

(c) On average, how many patients are there in the ER? (5 points)

Note: In the last stage (seeing a doctor), there are two types of patients,i.e. two types of flows. When you consider the average time in the last stage, you should take the weighted average because these two types of patients have different measures.

5. Elaine owns a computer rental store.  The rental process can be depicted by the following process flow diagram.

 

Return rate R

Customer arrivals to the store with an average rate of R = 20 per week and each customer requests for one computer. The rental time is 3 weeks on average. The rental fee is $300 per week. At the end of the rental  period, the customer returns his/her rented  computer to the store. Elaine will inspect every returned computer. The inspection time is negligible. On average 10% of the returned computers need to be repaired by a technician (repair actually means re-configuration and minor repair). A computer that needs repair spends an average time of 1 week in the repair stage, including waiting and repair. After repair work is completed, the computer will be put into the stock for rental. Returned computers that don’t need repair will  be put immediately into the stock for rental. To ensure that there are always computers available to satisfy customer requests, Elaine has to keep an average of 10 computers in the stock for rental.

(a) What is the total number of computers that Elaine needs for her rental business? (5 points)

(b) With an average of 10 computers in the stock for rental, on average how much time does a computer spend in the stock for rental before it is rented by a customer? (5 points)

(c) Elaine estimates that the average rental time will become 2 weeks if she increases the rental fee to $500 per week. The customer arrival rate, the repair time and the percentage of returned computers that need repair will remain the same. Again, she needs to have an average of 10 computers in the stock for rental. Should she increase the rental fee? Justify your answer by considering the number of computers required and the expected revenue per week. (5 points)

6. Bandai has a production line which produces Doraemon toys. There are three steps: in the molding step, workers transfer plastic into the white figures; in the painting step, worker transfer the white figures into painted figures; in the packing step, workers transfer the painted figures into final boxed toys. Currently, the number of workers and the time needed for each step is listed as follows:

Step

Number of Workers

Time Needed (per Unit per Worker)

Molding

5

5 min

Painting

8

10 min

Packing

4

2 min

(a) Draw a flowchart to depict the toy production process. (5 points) (b) What is the bottleneck of the process? (5 points)

(c) Suppose the demand for toys is 60 units per hour. What is the flow rate of the process? What is the capacity utilization for each step? What is the implied utilization for each step? (5 points)

(d) Bandai plans to hire 17 new workers for the Doraemon production line. How should Bandai train and allocate these workers to different steps in order to maximize the capability of the production line? What if there are 34 new workers? (5 points)

7. Vernon, Andy, and Sean are getting ready for their last period in the exchange study in CBS. Following the final exams, they intend to throw a big party with many of their friends from back home. Presently, they have identified the following set of activities that need to be completed. They decide to not spend any work on preparing the party until all final exams are over. Moreover, they aim to spend a 3-day beach vacation as early as possible, but not before all party planning activities are completed.

On June 10, they will enter the final exam week, which will take 5 days. They then want to arrange for live music (which will take 5 days), evaluate a number of potential party sites (6 days), and prepare a guest list, which includes inviting their friends and receiving the RSVPs (7 days).  They want to visit their two most promising party sites, which they expect to take 4 days. However, this can only be done once they have completed the list of party sites. Once they have finished the guest list and received the RSVPs, they want to book hotel rooms for their friends and created a customized T-shirt with their names on it as well as the name of the guest. Hotel room reservation (3 days) and T-shirt creation (6 days) are independent from each other, but both of them require the guest list to be completed. Once they have picked the party site, they want to have a meeting onsite with an event planner, which they expect to take 4 days. And then, once all work is completed, they plan to takeoff to the beach.

(a) Draw a table to list all the activities, their immediate predecessors, and their durations. Draw the network based on the table. (5 points)

(b) What is the critical path? (5 points)

(c) For each activity, compute the slack time. (5 points)

8. The following table represents a project that should be scheduled using CPM:

 

 

Time (Days)

Activity

Immediate Predecessors

Optimistic

Most Likely

Pessimistic

A

-

1

3

5

B

-

1

2

3

C

A

1

2

3

D

A

2

3

4

E

B

3

4

11

F

C, D

3

4

5

G

D, E

1

4

6

H

F, G

2

4

5

(a) Draw the network. (5 points)

(b) What is the critical path? (5 points)

(c) What is the probability of completing this project within 16 days? (5 points)

9. Any suggestions/comments for the class so far? (Optional)

标签:DMS2030,average,per,labor,points,they,time,Compute,rental
From: https://www.cnblogs.com/qq---99515681/p/18409995

相关文章

  • CS5229 Advanced Computer Networks
    CS5229AdvancedComputerNetworksProgrammingAssignment1Semester1AY2024/251 OverviewInthisprogramming assignment,youwill explore sketch-based algorithms designed to mon- itor network traffic across a high-traffic network link. We......
  • 关于RTX 4090 微调llama2模型时出现nvcc fatal : Unsupported gpu architecture 'comp
    RTX4090是现在普通人可以轻松获取的最好的显卡了。运算速度仅次于专业图形卡TeslaA100,A800,H100RTX4090显卡是可以单卡推理llama27b和13b模型的,7b模型占用缓存14G左右,13b模型单卡推理显存占用在23G多点(只是运行一段时间容易爆显存),所以普通人都是可以使用llama2大语言模型。......
  • SC3060: Computer Graphics and Visualization
    SC3060:ComputerGraphicsandVisualizationSWLaborYourOwn ComputerMaking Images with MathematicsLab Experiments 1- 5SESSION 2024/2025SEMESTER 1COMPUTERSCIENCECOURSEMAKING IMAGESWITH MATHEMATICS1. OBJECTIVEInthiscourseworkyou w......
  • 基于Pinia和Compute的持久化localStorage登录态管理Vuejs 源码教学
    piniaPinia是一个专为Vue3设计的状态管理库,它借鉴了Vuex的一些概念,但更加轻量灵活,使得状态管理变得更加简单直观。Pinia通过提供一种基于Vue3响应式API的状态管理机制,让我们可以更加优雅地管理应用程序的状态。computedVue的computed属性是一种特殊的数据属性,它们根据组......
  • MaxCompute 入门:大数据处理的第一步
    在当今数字化转型的时代,企业和组织每天都在产生大量的数据。有效地管理和分析这些数据变得至关重要。阿里云的MaxCompute(原名ODPS)是一个用于处理海量数据的大规模分布式计算服务。它提供了强大的存储能力以及丰富的数据处理功能,让开发者能够快速构建数据仓库、实时报表系统、......
  • vue3中computed和watch的使用
    一computd计算属性computed是Vue3中用于创建计算属性的功能。它允许你定义基于响应式数据的动态值,这些值会在其依赖的数据发生变化时自动更新。使用场景依赖于其他响应式数据的计算结果:你可以创建一个计算属性,其值依赖于其他响应式数据,并在这些数据变化时自动更新。......
  • COMP90086 Computer Vision
    COMP90086Computer Vision,2024Semester 2Assignment2: PatchmatchingwithneuralnetworksIntroductionFindingcorrespondencesbetweenkeypointsisacriticalstepinmanycomputervisionapplications. It can be used to align images when constr......
  • Linguistics-English-Happy Labor Day September 2, 2024
    CelebratingthemanycontributionsworkershavemadetoAmerica'sstrength,prosperityandwell-being.Aswellastheirsocialandeconomicachievements.ThefirstLaborDayholidaywascelebratedonTuesday,September5,1882,inNewYorkCity,ina......
  • 2024年数字经济与计算机科学国际学术会议(DECS2024) 2024 International Conference on
    文章目录一、会议详情二、重要信息三、大会介绍四、出席嘉宾五、征稿主题六、咨询一、会议详情二、重要信息大会官网:https://ais.cn/u/vEbMBz提交检索:EICompendex、IEEEXplore、Scopus大会时间:2024年9月20-22日大会地点:中国-厦门终轮截稿日期:2024年9月16日(早投......
  • FIT1047 Introduction to computer systems, networks and security
    FIT1047 Introductiontocomputersystems, networksand security-S2 2024Assignment2– Processesand MARIE ProgrammingPurposeProcessesandprogramsarewhatmakescomputers do what we want them to do. Inthefirst partofthisassig......