首页 > 其他分享 >MathProblem 28 Furniture factory problem

MathProblem 28 Furniture factory problem

时间:2022-08-14 03:55:16浏览次数:51  
标签:10 20y 28 MathProblem factory sanding 60 problem minutes

A factory that produces tables and chairs is equipped with 10 saws, 6 lathes, and 18 sanding machines. It takes a chair 10 minutes on a saw, 5 minutes on a lathe, and 5 minutes of sanding to be completed. It takes a table 5 minutes on a saw, 5 minutes on a lathe, and 20 minutes of sanding to be completed. A chair sells for 10 and a table sells for 20. How many tables and chairs should the factory produce per hour to yield the highest revenue, and what is that revenue?

Solution

总共有 \(60min\), 由于上述条件是对于一台机器而言的,所以对于多个机器,可利用的时间即为 \(n\cdot 60 min\).

设 \(chair = x, table = y\), 我们需:

\[\max 10x+20y \]

限制条件为:

\[\begin{align} 10x+5y&\le 60*10\\ 5x+5y&\le 60*6\\ 5x+20y&\le 60*18 \end{align} \]

候选答案就在这些线的交点处,所以求解每个交点,然后取最大的 \(10x+20y\) 即可

标签:10,20y,28,MathProblem,factory,sanding,60,problem,minutes
From: https://www.cnblogs.com/xinyu04/p/16584713.html

相关文章

  • mysql 8.0.28 查询语句执行顺序实测结果
    TL;NRs根据实测结果,MySQL8.0.28中SQL语句的执行顺序为:(8)SELECT(5)DISTINCT<select_list>(1)FROM<left_table>(3)<join_type>JOIN<right......
  • acwing 1228. 油漆面积 扫描线
     X星球的一批考古机器人正在一片废墟上考古。该区域的地面坚硬如石、平整如镜。管理人员为方便,建立了标准的直角坐标系。每个机器人都各有特长、身怀绝技。它们感兴......
  • MathProblem 25 Guess the age problem
    Personxandyhavethefollowingconversation:x:Iforgothowoldyourthreekidsare.y:Theproductoftheiragesis36.x:Istilldon'tknowtheirages.......
  • MathProblem 24 Baby bottle problem
    Youneedtowarmmilkinababybottlefromitsinitialtemperatureof15degreescentigradeto25degrees.Youputthebottleinapotofboilingwaterwhich......